Skip to content
Accessibility

Increasing the energy efficiency of the dormitory of Zhytomyr Polytechnic University using factory-produced facade panels (PREFAB ZHYTOMYR)

  • SDG11
  • SDG9
icon_Democracy and Rule of Law

Rebuilding Ukraine

8VS1-VM-UA-RECPREF25
Timeframe 01.05.2026-30.09.2027 Aktiivne
Target group Žõtomõri Polütehnilise Ülikooli tudengid
Budget 3 694 030 EUR
Funders
  • ESTDEV

Ukraine needs a rapid and cost-effective reconstruction of war-damaged and obsolete buildings, while reducing the buildings’ high energy consumption and improving the living environment for residents. Factory renovation allows for a reduction in construction time and dependence on skilled labor, and ensures more consistent quality. Estonia can offer Ukraine its technology and practical experience, help adapt solutions to Ukrainian conditions, and train local engineers and construction sector specialists. The Zhytomyr dormitory pilot project allows for the creation of a replicable model in Ukraine that can later be applied to the renovation of many buildings.

Project objectives

The aim of the project is to implement and adapt Estonian factory renovation technology in Ukraine by renovating the Zhytomyr Polytechnic University dormitory as a pilot project and, based on this, creating an energy-efficient and repeatable renovation model suitable for Ukrainian conditions, which can be applied more broadly in the restoration of Ukraine's housing and dormitory stock.

Actions and results

Main project activities:

  • Analysis of the technical condition and baseline data of the building
  • Development of a factory renovation solution suitable for Ukrainian conditions
  • Pilot project design and construction preparation
  • Manufacturing of factory elements and renovation of the pilot site
  • Knowledge transfer and training of local specialists
  • Pilot project documentation and model scaling